Preconstruction

The existing concrete was heavily spalled and severely deteriorated.
Removal

The old structure was completely removed.
Construction

Eight 60,000lb 4-sided precast concrete units were set using a crane.

The roof was sealed with a membrane.

Structure was backfilled and paved, rail and barrier were set.