Pokamoonshine Rd over Carney Hollow Creek Bridge Replacement

Preconstruction

BR84_4970_crop.JPG
The existing concrete was heavily spalled and severely deteriorated.

Removal

BR084_0117_crop.jpg
The old structure was completely removed.

Construction

BR84_crane.jpg
Eight 60,000lb 4-sided precast concrete units were set using a crane.
BR84_mebrane.jpg
The roof was sealed with a membrane.
BR084_0006_crop.jpg
Structure was backfilled and paved, rail and barrier were set.